What is IT preventive maintenance?
It is the set of tasks done on planned dates to prevent failures: checking backups, installing updates, freeing disk space, reviewing access. Corrective maintenance reacts to problems; preventive maintenance reduces how many you get.
The spreadsheet sorts these tasks by frequency and criticality, shows which need approval and keeps a log of every run.
Which tasks does the spreadsheet include?
Fourteen sample tasks, ready to adjust. The table sums up the logic.
| Frequency | Examples | Approval needed? |
|---|---|---|
| Daily | Backup and antivirus alerts | No (read-only) |
| Weekly | Low disk space, pending restarts | No |
| Monthly | Windows and application updates | Yes: they may require a restart |
| Quarterly | Restore test, account and licence review | Yes, for most |
| Twice a year and yearly | Firmware, inventory, batteries, incident drill | Depends on the task |
Criticality (high, medium, low) shows what cannot slip. A postponed high-criticality task should be rescheduled within the same week.
How do you use approval and the log?
- Set "Approval needed?" to Yes for anything that can interrupt work, and name the approver by role.
- Agree on a time window outside peak hours and warn users beforehand.
- Log each run with date, asset, who did it, approval reference and result.
- For every "Failed", open a work order with the IT work order template.
Review the spreadsheet every six months. Tasks that never find a problem can run less often; tasks that fail often point to a root cause that deserves its own project. Keep the log for at least a year: it shows what was done when someone asks after an incident.
Can you do this without stopping work?
Yes, in most cases: with after-hours windows, pilot groups and tools that schedule installation. The guide to remote computer maintenance shows how, and the computer update policy helps formalize deadlines and exceptions. For the most important quarterly task, see how to test a backup restore.
FAQ
Does every task need approval?
No. Only those that can interrupt work or change the environment, such as installing updates, touching firmware or testing a restore. Read-only checks, such as reviewing alerts, do not.
What is the difference between preventive and corrective maintenance?
Preventive work happens on planned dates to avoid failures. Corrective work responds to a problem that already happened, usually through a support ticket or work order.
What if a task fails?
Record "Failed" with the reason, open a work order for the fix and set a new run date.